SKU: EVPOW-T2-T2-10M-16AMP-MERC-EQV-300-1

Mercedes EQS EV Charging Cable

Choose a Cable Type:
Choose a Cable Length:
Choose a Rated Power (Charge Speed):
Sale price

£169.99

  • - £13.00
  • Regular price £156.99 £130.83 ex VAT
    ( / )

    Free: next working day UK delivery · 2 year manufacturer's warranty · 30 day returns

    Add a weatherproof carry case to keep the cable off your boot carpet.

    Add a carry case
    Click here to be notified by email when Mercedes EQS EV Charging Cable becomes available.
    Type: EV Charging Cables > Type 2 > Mercedes
    Inlet type Type 2 for AC, CCS for DC
    Max onboard AC 11 kW three phase, 22 kW optional
    On a UK home supply 7.4 kW
    Charge port position Rear offside, on the right of the body
    Cable we recommend 32A single phase, and buy it long

    The biggest battery on this site

    The 2021 to 2023 EQS carries 107.8 kWh usable. The 2024 facelift carries 118. Quoted ranges reach about 507 miles on the facelift 450+, 492 on the 500 4MATIC and 389 on the AMG EQS 53, which are numbers no other car here comes close to.

    The 7.4 kW ceiling is the house, not the cable: three phase ratings only mean something where three phases arrive. So the 32A single phase lead is the whole decision, and the manufacturer charge time you have read is a three phase one. Mercedes quotes 600 minutes for a full charge on 11 kW and 300 on the optional 22 kW. Neither is available at a house, where the honest figure is about eighteen hours from genuinely empty.

    Why that number is less alarming than it sounds

    Eighteen hours reads badly until you work out what it buys. A seven hour off peak window on this car moves roughly 180 miles into the battery, which for most owners is a week of driving put back in a single night at the cheapest rate of the day.

    Nobody charges an EQS from nought. The practical pattern is topping up whatever the day used, which is usually two or three hours, and the eighteen hour figure only ever appears on a spreadsheet. What it does argue for is a cable that reaches without effort, because on a car like this you plug in every night out of habit rather than necessity, and a lead you have to drag round the car is one that eventually gets left coiled.

    How long a full charge takes

    Cable Power drawn at home Empty to full, 107.8 kWh battery Empty to full, 118 kWh battery Range added per hour
    Type 2, 32A single phase at home 7.4 kW 16 hours 30 mins 18 hours about 26 miles
    Type 2, three phase at 11 kW 11.0 kW 11 hours 12 hours about 38 miles
    Type 2, three phase at 22 kW 22.0 kW 5 hours 30 mins 6 hours about 77 miles
    Type 2 to 3 Pin from a socket 2.3 kW 53 hours 58 hours about 8 miles

    The arithmetic is simple: kWh over kW, 13 per cent on top for losses, rounded to the nearest quarter hour. The miles column uses 3.5 miles per kWh, which holds up in winter as well as summer. Columns are the 2021 to 2023 car and the 2024 facelift. The three pin row is there to be dismissed: a 13 amp socket needs the better part of three days for the larger pack.

    DC rapid charging is 200 kW, which is where an EQS makes up time on a long run. This cable is for the driveway.

    Which length for an EQS

    Rear offside, right of the body, as on the EQE and the rest of the range.

    The EQS is 5.22 metres long, which makes it the longest car we sell a cable for. Five metres is not a realistic choice unless you reverse in and the charge point is on the right; ten is the sensible default, and a long drive or a shared bay genuinely calls for fifteen or twenty. Pace it out from the socket to the flap with the car parked as it always is, then allow a little extra.

    How these cables are built

    It is a CE marked IEC 62196-2 cable, IP55 against the weather, rated to work between -30C and +50C.

    The three pin unit is IEC 62752 compliant, CE marked, IP67 against water and rated -30C to +60C. Backed by a two year manufacturer's warranty, with free next working day delivery and a 30 day return window.

    Related: Mercedes EQA EV Charging Cable, and Mercedes charging cables for every other model we cover. For a wall box or public post the lead is the Type 2 to Type 2 charging cable.

    Mercedes EQS charging cable questions

    What cable does an EQS need?

    A 32A single phase Type 2 to Type 2 cable, and we would buy 10 metres as a minimum on a car over five metres long.

    How long does an EQS take to charge at home?

    About sixteen hours for the 107.8 kWh car and eighteen for the 118 kWh facelift, from genuinely empty at 7.4 kW. In practice you top up what the day used, which is rarely more than a few hours.

    Is the 22 kW option worth having?

    Only with a three phase supply. It halves Mercedes's quoted time, but a British house gives 7.4 kW whichever charger is fitted.

    Where is the charge port?

    The rear offside, on the right of the body, the same as every other Mercedes EQ model.

    Cable specifications

    Connector type Type 2 to Type 2 Charging Cable
    Standard IEC 62196-2
    Rated power 16amp (3.6kW)
    Supply Single phase
    Cable length 10M
    Weatherproofing IP55
    Temperature range −30°C to +50°C
    Approval CE marked
    Warranty 2 year manufacturer's warranty

    Specifications follow the option you have selected above. Charging always runs at the lowest limit of your car, the charge point and the cable.