{"product_id":"chery-tiggo-9-super-hybrid-charging-cable","title":"Chery Tiggo 9 Super Hybrid Charging Cable","description":"\u003ctable class=\"evp-spec\"\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003cth scope=\"row\"\u003eInlet type\u003c\/th\u003e\n\u003ctd\u003eType 2 for AC, CCS2 for DC\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth scope=\"row\"\u003eMax onboard AC\u003c\/th\u003e\n\u003ctd\u003e6.6 kW single phase\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth scope=\"row\"\u003eOn a UK home supply\u003c\/th\u003e\n\u003ctd\u003e6.6 kW, the full rate\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth scope=\"row\"\u003eCharge port position\u003c\/th\u003e\n\u003ctd\u003eNearside rear flank, with the fuel filler on the offside\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth scope=\"row\"\u003eCable we recommend\u003c\/th\u003e\n\u003ctd\u003eType 2 to Type 2, 16A is enough for the car\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\n\n\u003ch2\u003eThe port is on the other side from the Tiggo 7 and 8\u003c\/h2\u003e\n\n\u003cp\u003eThis one catches people who already own another Chery. The Tiggo 9's charging socket is on the nearside rear, with the petrol filler on the offside, which is the opposite arrangement to the Tiggo 7 and Tiggo 8. Chery's own right-hand-drive specification sheet records it as passenger side rear, and a UK road test confirms it for a British car in plain words.\u003c\/p\u003e\n\n\u003cp\u003eThe nearside is the kerb side, which is a genuine convenience at a public charge point. On a driveway it means measuring to the left-hand rear corner rather than the right, and on a vehicle of 4.82 metres that difference is easily two metres of cable.\u003c\/p\u003e\n\n\u003ch2\u003eA rate that has actually been measured here\u003c\/h2\u003e\n\n\u003cp\u003eA 6.6 kW onboard charger is the whole story. It is a single phase unit needing about 29 amps, so a British house has no difficulty supplying it and a 7.4 kW charge point simply runs at the car's pace rather than its own.\u003c\/p\u003e\n\n\u003cp\u003eThis is the one Chery where somebody has put a meter on it. A UK road test plugged a Tiggo 9 into a 7.4 kW single phase wall box, saw a maximum of 7 kW at the charge point, and recorded a thirteen to ninety-nine per cent charge in four hours thirty-five minutes. Those two numbers are not in conflict: 7 kW is what the wall box delivered and the 6.47 kW that arrives when you divide the energy by the time is what reached the battery, the difference being conversion loss in the onboard charger. It confirms 6.6 kW as the car-side rating from real measurement rather than a data sheet.\u003c\/p\u003e\n\n\u003ch2\u003eThe biggest battery and the fastest DC of the three\u003c\/h2\u003e\n\n\u003cp\u003eThe UK gets only the all-wheel-drive version, with a 34.4 kWh battery, 428 PS and 580 newton metres. Chery UK quotes 87 miles of electric range, though 91 miles is widely repeated in the UK press from an earlier press pack. DC charging reaches 71 kW, giving thirty to eighty per cent in eighteen to twenty minutes, and the car offers 6.6 kW of vehicle-to-load power for running tools or appliances.\u003c\/p\u003e\n\n\u003cp\u003eAn export specification sheet also lists a 19 kWh front-wheel-drive grade with 41 kW DC charging. That car is not sold in the UK, so its figures should not be mixed in.\u003c\/p\u003e\n\n\u003ch2\u003eHow long a full charge takes\u003c\/h2\u003e\n\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003eCable\u003c\/th\u003e\n\u003cth\u003ePower drawn at home\u003c\/th\u003e\n\u003cth\u003eEmpty to full, 34.4 kWh battery\u003c\/th\u003e\n\u003cth\u003eRange added per hour\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eType 2, 16A at 6.6 kW, the car maximum\u003c\/td\u003e\n\u003ctd\u003e6.6 kW\u003c\/td\u003e\n\u003ctd\u003e6 hours\u003c\/td\u003e\n\u003ctd\u003eabout 23 miles\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eType 2, 16A at 3.6 kW\u003c\/td\u003e\n\u003ctd\u003e3.6 kW\u003c\/td\u003e\n\u003ctd\u003e10 hours 45 mins\u003c\/td\u003e\n\u003ctd\u003eabout 13 miles\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eType 2 to 3 Pin from a socket\u003c\/td\u003e\n\u003ctd\u003e2.3 kW\u003c\/td\u003e\n\u003ctd\u003e17 hours\u003c\/td\u003e\n\u003ctd\u003eabout 8 miles\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003cp\u003eThe arithmetic is simple: kWh over kW, 13 per cent on top for losses, rounded to the nearest quarter hour. The range column is deliberately cautious, at 3.5 miles per kWh. Chery publishes no usable figure, so the 34.4 kWh rated capacity is used. The road test above suggests the real usable window is close to that, which makes the table more reliable here than on the smaller Chery hybrids.\u003c\/p\u003e\n\n\u003cp\u003eSix and a half hours from flat is a full night rather than an evening, which is the price of the longest electric range in the range. Spending more on the lead changes nothing, as the car sets the rate.\u003c\/p\u003e\n\n\u003ch2\u003eWhich length for a Tiggo 9\u003c\/h2\u003e\n\n\u003cp\u003eNearside rear on a 4.82 metre SUV. If your charge point is on the left as you face the house and you reverse in, the run is short. Nose in, or a wall box on the offside, and you are routing the lead round or under the car.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/products\/10m-ev-charging-cables\"\u003eTen metres\u003c\/a\u003e is the sensible default and 15 metres covers the awkward layouts. Work it out from where the car genuinely sits, not where it could sit, and leave slack. Do not assume a lead that suited a Tiggo 7 or 8 will work here, because the socket has moved sides.\u003c\/p\u003e\n\n\u003ch2\u003eHow these cables are built\u003c\/h2\u003e\n\n\u003cp\u003eConstruction is to IEC 62196-2 with CE marking, IP55 weather protection and a -30C to +50C operating range.\u003c\/p\u003e\n\n\u003cp\u003eThe three pin unit is IEC 62752 compliant, CE marked, IP67 against water and rated -30C to +60C. Two year manufacturer's warranty. Delivery is free and next working day, and returns are open for 30 days.\u003c\/p\u003e\n\u003cp class=\"evp-see-also\"\u003eLooking at another Chery? Start with the \u003ca href=\"\/products\/chery-tiggo-7-super-hybrid-charging-cable\"\u003eChery Tiggo 7 Super Hybrid Charging Cable\u003c\/a\u003e, or browse every model in \u003ca href=\"\/collections\/chery-ev-charging-cables\"\u003eChery charging cables\u003c\/a\u003e. For a wall box or public post the lead is the \u003ca href=\"\/products\/type-2-to-type-2-charging-cables\"\u003eType 2 to Type 2 charging cable\u003c\/a\u003e.\u003c\/p\u003e\n\u003ch2\u003eChery Tiggo 9 Super Hybrid charging cable questions\u003c\/h2\u003e\n\u003ch3\u003eWhich side is the charge port on a Tiggo 9?\u003c\/h3\u003e\n\u003cp\u003eThe nearside rear, which is the opposite side to the Tiggo 7 and Tiggo 8. The petrol filler is on the offside.\u003c\/p\u003e\n\u003ch3\u003eHow fast does a Tiggo 9 charge at home?\u003c\/h3\u003e\n\u003cp\u003e6.6 kW. A UK road test measured 7 kW at the wall box and a thirteen to ninety-nine per cent charge in four hours thirty-five minutes, which works back to about 6.5 kW into the battery.\u003c\/p\u003e\n\u003ch3\u003eDo I need a 32A cable?\u003c\/h3\u003e\n\u003cp\u003eNo, the car takes 6.6 kW at most. A 16A lead covers it and the length matters far more than the amperage.\u003c\/p\u003e\n\u003ch3\u003eHow far does it go on electricity?\u003c\/h3\u003e\n\u003cp\u003eChery UK quotes 87 miles. You will see 91 miles quoted in the press, which appears to come from an earlier press pack.\u003c\/p\u003e\n\u003ch3\u003eCan it rapid charge?\u003c\/h3\u003e\n\u003cp\u003eYes, at 71 kW, which is the highest of the three Chery hybrids. Thirty to eighty per cent takes eighteen to twenty minutes.\u003c\/p\u003e\u003c!-- faq-schema --\u003e\u003cscript type=\"application\/ld+json\"\u003e{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Which side is the charge port on a Tiggo 9?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The nearside rear, which is the opposite side to the Tiggo 7 and Tiggo 8. The petrol filler is on the offside.\"}},{\"@type\":\"Question\",\"name\":\"How fast does a Tiggo 9 charge at home?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"6.6 kW. A UK road test measured 7 kW at the wall box and a thirteen to ninety-nine per cent charge in four hours thirty-five minutes, which works back to about 6.5 kW into the battery.\"}},{\"@type\":\"Question\",\"name\":\"Do I need a 32A cable?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No, the car takes 6.6 kW at most. A 16A lead covers it and the length matters far more than the amperage.\"}},{\"@type\":\"Question\",\"name\":\"How far does it go on electricity?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Chery UK quotes 87 miles. You will see 91 miles quoted in the press, which appears to come from an earlier press pack.\"}},{\"@type\":\"Question\",\"name\":\"Can it rapid charge?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, at 71 kW, which is the highest of the three Chery hybrids. Thirty to eighty per cent takes eighteen to twenty minutes.\"}}],\"@id\":\"https:\/\/www.ev-power.co.uk\/products\/chery-tiggo-9-super-hybrid-charging-cable#faq\"}\u003c\/script\u003e\u003c!-- \/faq-schema --\u003e","brand":"EV Power","offers":[{"title":"Type 2 to Type 2 Charging Cable \/ 10M \/ 16amp (3.6kW)","offer_id":46905624297669,"sku":"EVPOW-T2-T2-10M-16AMP-CHERY-TIGGO9","price":156.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 10M \/ 32amp (7.2kW)","offer_id":46905624330437,"sku":"EVPOW-T2-T2-10M-32AMP-CHERY-TIGGO9","price":178.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 10M \/ 32amp - 3 Phase (22kW)","offer_id":46905624363205,"sku":"EVPOW-T2-T2-10M-32AMP(3P)-CHERY-TIGGO9","price":202.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 15M \/ 32amp (7.2kW)","offer_id":46905624395973,"sku":"EVPOW-T2-T2-15M-32AMP-CHERY-TIGGO9","price":275.0,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 20M \/ 32amp (7.2kW)","offer_id":46905624428741,"sku":"EVPOW-T2-T2-20M-32AMP-CHERY-TIGGO9","price":349.0,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 5M \/ 16amp (3.6kW)","offer_id":46905624461509,"sku":"EVPOW-T2-T2-5M-16AMP-CHERY-TIGGO9","price":124.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 5M \/ 32amp (7.2kW)","offer_id":46905624494277,"sku":"EVPOW-T2-T2-5M-32AMP-CHERY-TIGGO9","price":137.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to Type 2 Charging Cable \/ 5M \/ 32amp - 3 Phase (22kW)","offer_id":46905624527045,"sku":"EVPOW-T2-T2-5M-32AMP(3P)-CHERY-TIGGO9","price":162.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to 3 Pin Charging Cable \/ 10M \/ 6amp – 12amp Adjustable (2.3kW)","offer_id":46905624559813,"sku":"EVPOW-3P-T2-10M-CHERY-TIGGO9-V2","price":232.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to 3 Pin Charging Cable \/ 5M \/ 6amp – 10amp Adjustable (2.3kW)","offer_id":46905624592581,"sku":"EVPOW-3P-T2-5M-CHERY-TIGGO9-V5","price":187.99,"currency_code":"GBP","in_stock":true},{"title":"Type 2 to 3 Pin Charging Cable \/ 15M \/ 6amp – 12amp Adjustable (2.3kW)","offer_id":46905624625349,"sku":"EVPOW-3P-T2-15M-CHERY-TIGGO9-V2","price":279.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0414\/3880\/6174\/files\/c82e88bf24763264fef4d72e509717c2_ab03c8a0-c856-4231-b57f-b0fb07d56a6f.jpg?v=1789284339","url":"https:\/\/www.ev-power.co.uk\/products\/chery-tiggo-9-super-hybrid-charging-cable","provider":"EV Power","version":"1.0","type":"link"}